How Many Months Does It Take to Remodel a Kitchen?

Author Image

By Trinity Archie

Updated: Sep 09, 2025

8 min read

How Long Does It Take To Remodel A Kitchen
AI Generated Image: Heaven Gables

Table of Content

    Generally, it takes about three weeks to four months to completely remodel a kitchen. The time also depends on the complexity of the design of your new kitchen, the size of the space, and the overall project scope. Kitchen remodels are unique and involve the coordination of electricians, plumbers, and other subcontractors. In addition, the time and cost of your kitchen remodel also depend on whether you are just adding onto an existing footprint or upgrading the footprint. Read the article further to understand in detail the time taken to remodel a kitchen along with factors.

    Factors Responsible for Kitchen Remodel Timeline

    These factors affect the time that your kitchen remodel can take:

    • Project Size and Scope: Larger projects take more time, and smaller projects could be faster.

    • Custom Order Materials Availability: Waiting for unique or custom pieces to be built or shipped can prolong the timeline.

    • Availability and Schedules of Contractors: Coordinating and scheduling meetings to discuss the project with different people can be time-consuming.

    • Unpredicted Delays: Structural surprises happen all the time, and shipping material delays are a normal part of the process.

    • Personal Timeline: The amount of time you take to make decisions and stay involved in the process directly affects the pace of the remodel.

    Detailed Timeline of Kitchen Remodel

    Planning and Selection of the Design

    (Around 1 month)

    The design, selection, and procurement process are the first few steps of remodeling your kitchen. In this process, the designer creates a 3D rendering of your kitchen, including the pantry, kitchen layout, cabinetry, fixtures, appliances, and lighting. The selection phase identifies the design aesthetics of the space and helps you select a variety of finishes, fixtures, cabinetry, and accessories.

    After the selections for the components of your new custom kitchen are settled, the designer will procure all finishes and unique items before starting the construction and demolition phase. Typically, all this can take up to 30 days.

    A labor-only contractor will not procure the finishes. When you are not working with a firm specialized in remodeling work, you may end up with wrong vendor measurements. It can also cause longer lead times, miscommunication, and poor coordination logistics.

    Demolition of the Kitchen

    (Around 1-2 weeks)

    A Kitchen Being Demolished
    AI Generated Image: Heaven Gables

    After the planning is made, the next step is the demolition of the current kitchen. The demolition tasks include removing old kitchen structures, cabinets, and countertops, removing old appliances, demolishing walls, and removing flooring. The demolition stage usually takes around 1 to 2 weeks.

    You will also need protection at the place around the site that confines any dust, debris, or anything else hazardous for workers. Zip walls can be used to seal the demolition area. Likewise, sticky pads can be placed on the floors around the space to ensure that no one walks out with anything on their shoes.

    Construction

    (Around 4-6 weeks)

    The construction is the last phase of a kitchen renovation, where all the planning and preparation on paper turns into a reality. If your remodel is extensive, there will be excessive noise and dust in your home.

    Builders start with framing work and conclude the work with testing and cleaning. In between, they install new electrical and new plumbing, then finish with all the new walls, floors, cabinets, countertops, accessories, and new fixtures. Once the construction starts, it normally takes about four to six weeks.

    It is common to see mold or asbestos in older homes during the demolition and construction phase, which can dramatically increase your budget and timeline. If you order new appliances, make sure they are delivered on time and are available for installation right on time.

    Issues Faced During a Kitchen Remodel

    Here are some challenges you might face while remodeling your kitchen:

    Getting Multiple Subcontractors to Work Together

    A kitchen remodel often requires dealing with many subcontractors like electricians, plumbers, and carpenters. Conflicts and miscommunication are some of the main issues that need to be dealt with carefully for the project to run smoothly. An experienced general contractor overseeing the project can be useful in this case.

    Plumbing Issues

    Issues like leaking pipes or outdated plumbing systems could become problems during the remodel. Such problems can extend the project completion timeline and increase the budget. It is beneficial to have an experienced plumber by your side who can fix small issues on time before they turn into bigger ones.

    Budget

    It's hard to keep your remodel within budget. An unexpected situation, alteration in design, or even an upgrade in material will cause an increase in budget. To prevent this, prepare a well-planned budget along with a plan for unexpected costs and try to stick to your original plan.

    Design and Layout Challenges

    Trying to keep both beauty and strong functionality in a kitchen can prove to be quite challenging. Some problems you may run into are windows in the wrong places, not enough kitchen storage, or an overall layout different from your envision. Cooperating with an expert designer can be a solution to overcoming such issues.

    Getting Permits

    Not getting the proper permits and passing any inspections on time can be an exhausting process. To guard yourself from potential project delays, make sure you know exactly what is required in your area so you may take into account these delays before talking with your contractor. Hiring a general contractor with knowledge of the local regulations will speed up the process.

    Ways to Speed up the Remodeling

    A Modern Renovated Kitchen Interior
    AI Generated Image: Heaven Gables

    Plan Your Budget Beforehand

    Establish a precise spending plan, recognize your spending limit, and adhere to it. By doing this, delays brought on by unforeseen expenses halfway through the project are avoided.

    Order for Materials in Advance

    Place your material order in advance. You can avoid waiting for delivery by placing your order for these items as soon as your design plan is complete.

    Comprehensive Design Plans

    Prior to beginning any work, have a thorough design plan. A clear visual aid minimizes last-minute alterations and misunderstandings.

    Interaction With the Contractor

    In the beginning, make sure you convey your requirements and vision when speaking with your designer and contractor. If something doesn't feel right, follow your instincts. Having clear communication will reduce misunderstandings and time alterations caused by it.